The contractor plans to complete the storm sewer work by Friday, 8-21-09. Concrete curb work will be Monday, 8-24-09. The contactor is accommodating residents who need to access their driveways for “move-in”.
The contactor is accommodating residents who need to access their driveways for “move-in”.
During the week of 9/8, Borough crews will be working on restoring the sidewalk/handicapped ramps at the following locations:
Garner Street (east side)
Pugh Street (east side) Crews will also replace a streetlight foundation at McAllister Street.
S. Allen St.
Foster Ave. to Irvin Ave.
E. Hamilton Ave.
Locust Lane to Hetzel St.
Storch Road
S. Sparks St. to Cul-de-Sac
Berry Alley
Apple Alley
E. Fairmount to E. Prospect
Chestnut Alley
Apple Alley to Berry Alley
D Alley
Foster Ave to Highland Alley
From the latest contractor’s schedule {weather pending}:
Mill streets & alleys – 9/8 through 9/11
Paving of alleys & Hamilton – 9/14-9/16
Paving Storch Road and Allen Street – 9/16-9/18